Monitoring microservices is hard. When a user request fans out across multiple services each with its own database, its own logs, and its own failure modes traditional monitoring tools give you a fragmented picture. You see that something is slow, but not where or why.

Distributed tracing solves this by tracking a single request as it travels through every service in your system. In this tutorial, we'll implement distributed tracing for a custom-built Java Spring Boot microservices application using two open-source tools: OpenTelemetry and OpenObserve. If your stack includes other languages, we also have guides on implementing distributed tracing in .NET, Go, and Node.js applications with OpenTelemetry.

By the end, you will have:

  • A working three-service Spring Boot application with real cross-service HTTP calls
  • Zero-code automatic instrumentation via the OpenTelemetry Java Agent
  • Traces flowing into OpenObserve with full flamegraph and Gantt chart visualization

What is Distributed Tracing?

In a microservices architecture, a single user action may touch dozens of services. If the request takes 3 seconds, which service is responsible? Which database query is the bottleneck?

Read our detailed guide on Distributed Tracing and beyond

Distributed tracing answers these questions by attaching a trace context a trace_id and span_id to every request at the entry point, then propagating it through every downstream service call via HTTP headers. This produces a trace: a complete, end-to-end record of the request's journey through your system.

A trace is composed of spans one per operation. Each span records:

  • The service and operation name
  • Start time and duration
  • HTTP method, URL, status code
  • Database queries (table, SQL)
  • Any errors or exceptions
  • Parent-child relationships to other spans

When visualized together, spans form a flamegraph that immediately shows where time was spent and where failures occurred. Key components of distributed tracing in an e-commerce example illustrated in a sequence diagram

OpenTelemetry and OpenObserve

OpenTelemetry

OpenTelemetry is a CNCF project that provides a vendor-agnostic standard for generating and exporting telemetry data (traces, metrics, logs). For Java, it provides a powerful Java Agent a single JAR that auto-instruments your application at JVM startup. It detects Spring Boot, JDBC, HTTP clients, and 100+ popular libraries with no code changes required.

OpenTelemetry handles instrumentation. It exports data using the OTLP (OpenTelemetry Protocol) to a backend of your choice.

OpenObserve

OpenObserve is that backend. It is a high-performance open-source observability platform built for logs, metrics, and traces. Written in Rust, it is:

  • Storage-efficient uses significantly less disk space than legacy alternatives
  • Single binary runs with a single Docker command in development
  • OTLP-native accepts traces directly from the OpenTelemetry agent
  • SQL-powered lets you query trace data using SQL for custom analysis
  • Unified logs, metrics, and traces all in one interface

Running a sample Spring Boot Java application with OpenTelemetry

We will build a custom Spring Boot microservices application from scratch with four services:

Service Port Responsibility
discovery-service 8761 Eureka service registry
user-service 8081 User CRUD, backed by MySQL
order-service 8082 Order management; calls user-service
payment-service 8083 Payment processing; calls order-service

The key distributed tracing scenario is triggered when a payment is processed: Payment Processing WorkflowThis creates a trace with spans spanning three services and one database, which is exactly the kind of request chain that's invisible without distributed tracing.

Each service runs with the OpenTelemetry Java Agent attached, which propagates the trace_id via traceparent HTTP headers automatically.

Prerequisites

  • Java 17+
  • Maven 3.8+
  • Docker and Docker Compose
  • MySQL 8 (or use Docker covered below)

Step 1 : Clone the Project

The complete source code for all four services is available in this repository. Clone it and navigate into the project root:

git clone https://github.com/openobserve/java-distributed-tracing.git
cd java-distributed-tracing

Step 2 : Start OpenObserve and MySQL with Docker Compose

The docker-compose.yml in the project root spins up both OpenObserve and MySQL:

docker-compose up -d

Docker Compose

This starts:

  • OpenObserve on http://localhost:5080 (UI + OTLP HTTP endpoint)
  • MySQL 8 on localhost:3306 with a tracingdb database

Verify OpenObserve is running by opening http://localhost:5080 in your browser. Log in with:

  • Email: admin@example.com
  • Password: Admin123!

You should see the OpenObserve dashboard.

OpenObserve dashboard

Navigate to Traces in the sidebar it will be empty for now, but we'll fix that shortly.

Step 3: Download the OpenTelemetry Java Agent

The OpenTelemetry Java Agent auto-instruments Spring Boot, JDBC, RestTemplate, and more all without touching your source code.

Create an agents/ folder in the project root and download the latest agent JAR:

mkdir agents
curl -L https://github.com/open-telemetry/opentelemetry-java-instrumentation/releases/latest/download/opentelemetry-javaagent.jar \
     -o agents/opentelemetry-javaagent.jar

Download the OpenTelemetry Java Agent

All four service startup scripts reference ../agents/opentelemetry-javaagent.jar, so this single download covers every service.

Step 4: Understand the OpenTelemetry Configuration

Each service's scripts/start.sh configures the OpenTelemetry Java Agent to export traces to OpenObserve. Let's break down what each flag does.

Here is the startup script for user-service (the other services follow the same pattern):

export OTEL_SERVICE_NAME=user-service
export OTEL_RESOURCE_ATTRIBUTES=service.name=user-service,deployment.environment=dev
export OTEL_TRACES_EXPORTER=otlp
export OTEL_METRICS_EXPORTER=none
export OTEL_LOGS_EXPORTER=none
export OTEL_EXPORTER_OTLP_TRACES_ENDPOINT=http://localhost:5080/api/default/traces
export OTEL_EXPORTER_OTLP_TRACES_PROTOCOL=http/protobuf
export OTEL_EXPORTER_OTLP_TRACES_HEADERS="Authorization=Basic {token}"

java \
  -Xms256m \
  -Xmx512m \
  -javaagent:../agents/opentelemetry-javaagent.jar \
  -jar target/user-service-0.0.1-SNAPSHOT.jar

Key variables explained:

Variable Value What it does
OTEL_SERVICE_NAME user-service Labels this service's spans and metrics in OpenObserve
OTEL_TRACES_EXPORTER otlp Enable trace export via OTLP
OTEL_EXPORTER_OTLP_TRACES_ENDPOINT .../traces OpenObserve OTLP traces endpoint
OTEL_EXPORTER_OTLP_TRACES_HEADERS Authorization=Basic ... Basic auth token fetched from OpenObserve

You can fetch the Header token from OpenObserve UI: OpenTelemetry Configuration Token

Step 5: Start the Discovery Service

The discovery service is a Eureka server. The other three services register with it on startup.

cd discovery-service
mvn clean install -Dmaven.test.skip
sh scripts/start.sh

Open http://localhost:8761 to confirm the Eureka dashboard is live. You won't see any registered instances yet.

Start the Discovery Service

Step 6: Start the Microservices

Open three separate terminal windows and start each service:

Terminal 1 user-service:

cd user-service
mvn clean install -Dmaven.test.skip
sh scripts/start.sh

Terminal 2 order-service:

cd order-service
mvn clean install -Dmaven.test.skip
sh scripts/start.sh

Terminal 3 payment-service:

cd payment-service
mvn clean install -Dmaven.test.skip
sh scripts/start.sh

Once all three are running, revisit the Eureka dashboard at http://localhost:8761 you should see all three services listed under "Instances currently registered with Eureka".

Eureka dashboard

Step 7: Generate Traces by Calling the APIs

Now let's create some user requests that will flow across services and produce traces. You can use curl or any API client like Postman.

1. Create a user:

curl -X POST http://localhost:8081/api/users \
  -H "Content-Type: application/json" \
  -d '{
    "name": "Priya Sharma",
    "email": "priya@example.com",
    "phone": "+91-9876543210"
  }'

Expected response:

{
  "id": 1,
  "name": "Priya Sharma",
  "email": "priya@example.com",
  "phone": "+91-9876543210"
}

Generate Traces by Calling the APIs

2. Create an order for that user:

curl -X POST http://localhost:8082/api/orders \
  -H "Content-Type: application/json" \
  -d '{
    "userId": 1,
    "productName": "Mechanical Keyboard",
    "quantity": 1,
    "totalAmount": 4999.00
  }'

This triggers a cross-service call: order-service calls user-service to verify the user exists before creating the order. Two services, one trace.

Expected response:

{
  "id": 1,
  "userId": 1,
  "productName": "Mechanical Keyboard",
  "quantity": 1,
  "totalAmount": 4999.00,
  "status": "PENDING",
  "createdAt": "2026-02-15T10:30:00"
}

Generate Traces by Calling the APIs

3. Process a payment (the richest trace):

curl -X POST http://localhost:8083/api/payments/process \
  -H "Content-Type: application/json" \
  -d '{
    "userId": 1,
    "orderId": 1,
    "amount": 4999.00,
    "currency": "INR",
    "paymentMethod": "UPI"
  }'

This triggers the full call chain: payment-serviceorder-serviceuser-service → MySQL

Expected response:

{
  "transactionId": "TXN-A1B2C3D4",
  "userId": 1,
  "orderId": 1,
  "amount": 4999.00,
  "currency": "INR",
  "status": "SUCCESS",
  "message": "Payment processed successfully",
  "processedAt": "2026-02-15T10:31:00"
}

Generate Traces by Calling the APIs

4. Test an error case order for a non-existent user:

curl -X POST http://localhost:8082/api/orders \
  -H "Content-Type: application/json" \
  -d '{
    "userId": 9999,
    "productName": "Test Product",
    "quantity": 1,
    "totalAmount": 100.00
  }'

This will return a 400 Bad Request. The failed cross-service lookup will appear in OpenObserve as an errored span useful for testing error visibility.

Generate Traces by Calling the APIs

Make several of these requests in different combinations to generate a rich set of trace data.

Visualizing Traces in OpenObserve

Head to the OpenObserve UI at http://localhost:5080 and click Traces in the left sidebar.

The Trace Explorer

The Trace Explorer shows all incoming traces with filters at the top. You should immediately see traces from the three services listed in the service dropdown. The trace list shows:

  • Trace ID unique identifier for the end-to-end request
  • Root span the entry point operation (e.g., POST /api/payments/process)
  • Service which service received the request
  • Duration total time for the end-to-end trace
  • Spans number of spans in the trace
  • Status success or error

The Trace Explorer

Filtering Traces

Use the filters to narrow down what you're looking at:

  • Filter by service_name = payment-service to see only payment requests
    Filtering Traces by service name

  • Filter by status = ERROR to find failed requests
    Filtering Traces by error

  • Use the duration slider to find slow outliers

  • Filter by operation_name to focus on a specific endpoint

Flamegraph and Gantt Chart: The Full Picture

Click on any trace from the POST /api/payments/process request. OpenObserve opens the trace detail view, which shows two visualizations:

Flamegraph - each span is rendered as a proportionally-sized horizontal block nested under its parent. The payment service span is the root; underneath it you can see the order-service span and within that the user-service span and its MySQL JDBC span. The width of each block represents time wider means slower. You immediately see which service contributed most to the total latency.

Flamegraph

Gantt Chart the same spans laid out on a timeline. Each row is one span, with start time and duration shown as a bar. Clicking a span opens its detail panel, which shows:

  • HTTP method, URL, response status code
  • Database table and SQL query (for JDBC spans)
  • Exception message and stack trace (for errored spans)
  • trace_id and span_id
  • All OpenTelemetry semantic convention attributes

Gantt Chart

Querying Traces with SQL

One of OpenObserve's standout features is the ability to query your trace data directly using SQL. Click Logs (traces are queryable through the same SQL interface) and select the default stream.

Find the slowest payment traces in the last hour:

SELECT trace_id, duration, service_name, operation_name
FROM "default"
WHERE service_name = 'payment-service'
  AND operation_name LIKE '%payments/process%'
ORDER BY duration DESC
LIMIT 10;

Querying Traces with SQL

Count errors by service:

SELECT service_name, COUNT(*) as error_count
FROM "default"
WHERE span_status = 'ERROR'
GROUP BY service_name
ORDER BY error_count DESC;

Count errors by service

Average latency per service:

SELECT service_name, 
       AVG(duration) as avg_duration_us,
       MAX(duration) as max_duration_us,
       COUNT(*) as request_count
FROM "default"
GROUP BY service_name;

Average latency per service

This SQL interface means you can build custom dashboards and alerts on top of your trace data using the same query language you already know.

What the OpenTelemetry Agent Captures Automatically

One thing worth emphasizing: we wrote zero tracing code in any of the Spring Boot services. The OpenTelemetry Java Agent detected and instrumented:

  • All inbound HTTP requests (Spring Web MVC) creates a server span for each request
  • All outbound HTTP calls via RestTemplate creates a client span and injects traceparent headers
  • All JDBC queries (MySQL via Spring Data JPA) creates a DB span with query details
  • Context propagation the trace_id flows from payment-service to order-service to user-service automatically via the W3C traceparent header

The agent supports 100+ libraries and frameworks out of the box, including Kafka, gRPC, Redis, Spring Batch, and more.

Conclusion

In this tutorial, we built a complete Java microservices application from scratch and implemented distributed tracing with zero instrumentation code. The combination of the OpenTelemetry Java Agent and OpenObserve gives you:

  • Automatic span creation across Spring Boot, JDBC, and RestTemplate
  • Full trace propagation across service boundaries via W3C traceparent headers
  • Rich visualization flamegraphs, Gantt charts, and span attribute detail in OpenObserve
  • SQL-powered analysis query your trace data like a database table
  • Unified observability the same OpenObserve instance can receive your logs and metrics too

The architecture shown here scales directly to production. Swap the single-container OpenObserve setup for a Helm deployment with S3 storage, and you have an enterprise-grade observability stack with no vendor lock-in.

Further Read

About the Author

Simran Kumari

Simran Kumari

LinkedIn

Passionate about observability, AI systems, and cloud-native tools. All in on DevOps and improving the developer experience.

Latest From Our Blogs

View all posts